One person sorts out the whole system
You don't want to manage four different contractors. With FLoWater you deal with one person, Rupert Nel, from the first message to the handover. He does the survey, the quote, the orders and the bookings. Our installer does the work, and a plumber connects the system to your mains. The whole job usually takes two to three weeks. Most of that time, we wait for the tanks.
-
1
Before anyone drives out
Send us photos on WhatsApp
From these photos, we can usually tell you which system fits and what it's likely to cost. We can also tell you if your site is likely to need extras. Do you want to talk first? Call us on 076 102 8956.
- Your water billYour latest municipal bill. It shows how much water you use.
- Meter and stopcockA photo of your water meter, and of the main stopcock or where the pipe enters the house.
- Tank spotWhere you want the tank.
- Downpipe RainwaterThe downpipe nearest that spot.
- Location pinSo we know where you are.
-
2
On site
Survey
We visit your site to measure it and take photos. At the survey, we:
- find the supply line from the meter to the house
- measure the lengths of pipe, trench and cable
- check your water pressure and the space in your distribution board
- check the slope where the slab goes, and the narrowest point of the path
- ask about your estate's rules, if you live in an estate
-
3
Within 48 hours
A written quote
The prices on this site are estimates. Your quote gives the real price for your site. It shows the package, the extras with their metres and rates, and the delivery time. The price in your quote stays the same for 14 days.
If we find a problem nobody could see. Sometimes the crew finds rock, concrete, roots, or old pipes and cables under the ground. Then they stop work, and we send you a price on WhatsApp. We do no extra work without your OK. -
4
Tank delivery: 7 to 14 days
Deposit and order
Your 50% deposit pays for the materials. The tanks arrive in 7 to 14 days. We get all the parts to your site the day before the install, so the team doesn't wait.
-
5
One to two days on site
Install
Our installer makes the slab and puts the tank on it. A plumber connects the pump and valves to your supply. An electrician fits the electrical point for the pump. Most installs take one to two days on site.
A full 5,000 L tank weighs about five tonnes. So the concrete slab must get hard before we fill the tank. Your quote gives the dates.
A garden-only rainwater tank doesn't connect to the house's plumbing. So you don't need a plumber for it. You need the tank, the gutter connection, the pump and an electrician for the plug point.
-
6
Same day
Handover
We close the mains and show you the house running from the tank. On the same day, we send you these on WhatsApp:
- A plumbing certificate of compliance (CoC), on larger jobs
- Photos of each stage of the install
- Your one-year workmanship warranty
You pay the balance at handover.
-
7
Every year
Aftercare
We suggest a service once a year. WhatsApp or call us to book one. If you have a filter, we change the cartridges and the UV lamp at that visit. We service the systems we installed.
Mains in, tank, pump, house
Mains water fills the tank through a float valve. The pump takes water from the tank and supplies the house at normal pressure. A bypass connects the mains directly to the house. You use the bypass while we service the tank.
What the price includes, and how we price extras- Water supply
- Bypass
Start with the photos
Send your water bill and a few photos. That's enough for us to tell you what you're likely to need.